Exterior of a custom home

Renovation

The Two-Story Renovation

Bedrooms
3
Baths
2.5
Living area
1,666 sq ft
Renovated
2019
Stories
2

The 2019 work covered both the exterior and the interior. Outside, the scope included new windows, a new roof, fiber-cement siding, a sprinkler system, and landscaping and lighting. Inside, the renovation included new appliances, quartz counters, custom cabinets, faucet and bath fixtures, lighting, tile-plank flooring on the first floor, new doors and trim, and a full interior paint. A new HVAC system was installed in December 2018.

The plan has two living areas and two dining areas, with laundry in the garage and the primary bedroom upstairs.